Last week for MyGeorgia Credit Union, Consultants and Builders completed drywall finishing and the prime painting of all walls. Installation of rough-in for recessed floor outlet and remaining electrical and data outlets in existing walls wrapped up.
This week CBI will install door and window frames, measure for glass at window frames, install ceiling grid throughout, and begin installation and wiring of light fixtures. On the exterior, CBI will form and pour concrete curb at drive thru location, and begin rough-in of pneumatic tube system.